The Blue Wire team have recently completed the electrical installation for the new kitchen at The George and Dragon in Flockton, Yorkshire. The installation comprised of a new sub main supply to kitchen and large outside unit which was converted to the prep kitchen. From the new distribution boards small lighting and power was then installed including oven/dishwasher/socket outlet supplies. As we cover all aspects of electrical installations in addition to the power and lighting the team also installed the gas interlock system/ extraction and fresh air fans and additional intruder alarm p.i.r.s.